RAF Syerston Central Gliding School
RAF Syerston, UK
Construction of a storage building for the Central Gliding School at RAF Syerston has been completed.
Rubb Buildings Ltd UK provided a 25m span x 50m long BVR storage structure with sidewalls of 6m and overall height of 7.7m.
The facility, which features 6m wide x 5m high roller shutter doors at each end, will be used as a glider winch storage solution for the CGS in England. It was completed in March 2011.
Rubb worked with Mansell Construction Services Ltd on this project. A spokesperson from Mansell commended all aspects of Rubb's work as the 'highest quality'.
- Type: BVR
- Span: 25m
- Overall Length: 50m
- Clear area: 1250sqm
- Eaves Height: 6m
- Overall Height: ??m
What's in a Rubb Port Building? ...Total Quality
Read more about the design flexibility, speed of construction and durable, cost effective operation of Rubb port facilities.
What's in a Rubb Environmental Buildings? ...Total Quality
Read more about the design flexibility, speed of construction and durable, cost effective operation of Rubb environmental facilities.